Recladding on the Kapiti Coast
Full reclads of plaster and weatherboard homes: the old cladding off, the framing checked and repaired, a new cavity-based cladding system on, and the consent signed off. Done by a Licensed Building Practitioner, because it has to be.
Why Kapiti Houses Get Recladded
A lot of houses built on the Kapiti Coast between the early 1990s and the mid 2000s were clad in monolithic plaster systems fixed straight onto the framing with no drainage cavity behind them, often over untreated timber. Where water got in - at a window, a deck junction, a parapet, a penetration - it had nowhere to go, and the framing rotted quietly for years. Add a coastal climate with wind-driven rain from the west and salt in the air, and the coast has more than its share of homes that leak. Older weatherboard houses reach the same point by a slower road: boards that have split, paint that no longer holds, and rot at the bottom plates and window sills.
The Building Code requires that external walls and openings prevent moisture from causing dampness or damage - the requirement is set out in clause E2 External moisture - and a house that no longer does that cannot be fixed with paint. It needs the cladding off, the framing dealt with, and a cladding system that drains. That is a reclad, and it is one of the three things JMC Builders does.
What a Reclad With JMC Involves
-
Assessment and a quote
Jamie looks at the house inside and out: moisture readings where they can be taken, the junctions and penetrations, the deck and parapet details, the roof-to-wall flashings, and any rot that is already visible. From that, a quote for the reclad, with a clear statement of what has been allowed for in framing repairs and how anything beyond it will be priced.
-
Design, engineering and building consent
A full reclad is restricted building work and needs a building consent from Kapiti Coast District Council or Horowhenua District Council. Where the new cladding changes the look of the house, or a leaky-home claim or a resource consent is involved, JMC works with the designer, the engineer and the council so the paperwork is done before the scaffold goes up.
-
Scaffold, strip and inspection
Scaffold on every wall, the old cladding stripped off, and the framing exposed for the first honest look at what is behind it. This is the moment the job is really priced, and you are shown what was found.
-
Framing repairs and treatment
Rotten studs, plates, lintels and sills cut out and replaced, the remaining timber treated, and the structure checked and, where the engineer requires it, strengthened. On one of the houses in our photographs the leaks had done enough damage that a large part of a two-storey home had to be taken down and rebuilt.
-
Underlay, cavity and the new cladding
A rigid air barrier or wall underlay, then cavity battens so that any water that gets behind the new cladding drains out at the bottom, then the cladding itself: bevel-back or rusticated weatherboard, cedar, vertical board and batten, a modern plaster system on a cavity, or a combination. New flashings at every window and door, and new joinery where the old units are refitted or replaced.
-
Painting, inspections and sign-off
Council inspections at the stages the consent requires, the painters through, the final inspection and the code compliance certificate - the document that matters most when the house is next sold.
Choosing the New Cladding
A reclad is also the one chance a house gets to change its face. Most owners of a plaster clad house on the coast take the opportunity to move to cedar, Abodo, Nu Wall, ply and the like, partly for the look and partly because a cavity-fixed board system is easy to inspect and maintain; others keep a plaster look on a modern cavity system. Jamie will talk you through the options on the first visit, with the costs of each, and can put you in touch with a designer if the house is going to change enough to need drawings for the council. The choice also affects the joinery: aluminium windows can often be refitted with new flashings, but where they were part of the problem, replacing them while the walls are open is the sensible time.
What Affects the Cost and the Time
The size of the house, the number of storeys and the cladding you choose set the base price; what sets the final price is the framing. A house with a few wet corners is a different job from one that has been leaking for fifteen years, and nobody can see all of it until the cladding is off. The quote therefore states an allowance for framing repairs and how anything beyond it is charged, so there are no surprises about how surprises are handled. A full reclad of a single-storey house usually takes two to three months on site; a two-storey house or one with significant rebuilding, longer. If the inside of the house is due a change as well, our renovations and extensions page covers doing both at once, which shares the scaffold, the consent and the trades. And if the damage turns out to be beyond saving, a new build on the same section is the honest alternative, and Jamie will say so. Have a look at our work to see the standard the job will be finished to.
Contact Us
To talk about recladding a house in Pukerua Bay, Paekakariki, Raumati, Paraparaumu, Waikanae, Peka Peka, Te Horo, Otaki or Levin, ring Jamie on 021 052 4447 or send the details through the form below. The year the house was built and a few phone photos of the outside, particularly around the windows and any decks, will get you a much more useful first conversation.
A Reclad, Stage by Stage
Different houses, the same sequence: scaffold and strip, framing exposed and repaired, underlay and cavity, the new cladding on.
A Reclad, In the Owners' Words
Jamie was recommended to us following a botched double glazing installation contract. Jamie proved a constructive and supportive sounding board to resolve the situation. This required a new resource consent, the removal of the plaster cladding, selection of new cladding and reinstallation of the new double glazing units. Half way through this work significant water leaking damage was uncovered resulting in the demolition of a significant portion of our two storey dwelling. Throughout this period Jamie provided excellent practical problem solving skills, ensuring all the paperwork was completed plus going the extra mile to deliver a high quality finish. His staff were skilled and focused on getting this complex job completed. Jamie is a highly competent builder who delivers and takes pride in his work.
Recladding Questions
How do I know if my house needs recladding?
Cracked or bulging plaster, soft or stained linings inside near windows and corners, musty smells, rot you can push a screwdriver into, a monolithic plaster house from the 1990s or 2000s with no drainage cavity, or a pre-purchase report that says so. If any of those apply, Jamie can come and look. Some houses need a targeted repair rather than a full reclad, and he will tell you which.
Does a reclad need a building consent?
A full reclad does, yes, and the work is restricted building work that has to be done or supervised by a Licensed Building Practitioner. JMC handles the consent application, the inspections and the code compliance certificate at the end. A small like-for-like repair of a section of cladding may not need a consent; Jamie will tell you which yours is.
Can we stay in the house during a reclad?
Usually, yes. A reclad is done from the outside, so the inside of the house stays liveable, though it is noisy and the windows will be covered or out for periods. Where the leaks have damaged the inside as well, some rooms may be out of action while they are rebuilt.
What happens if you find more rot than expected?
You are shown it the day it is found, and given a price for the extra repair before it is done. The quote states what has been allowed for and how anything beyond it is charged, so the way surprises are handled is agreed before the scaffold goes up.
Can we change the look of the house at the same time?
Yes, and most people do - plaster to weatherboard or cedar, a new colour, new joinery, a different entry. Big changes may need drawings for the council, and Jamie can put you in touch with a designer for that.
Other Work We Do
One builder for the bigger jobs: new homes, renovations and extensions, and reclads, anywhere from Pukerua Bay to Levin.
New Builds
Architectural and custom new homes from the first site visit to handover: foundations, framing, cladding, joinery and the finish, with the consent, the engineer and the other trades organised by Jamie. Read more
Renovations & Extensions
Whole-house renovations, extensions, second storeys and structural alterations that add rooms and open up the living areas, planned so the house keeps working while the work happens. Read moreTalk to Jamie About Your Project
Tell us what you have in mind and roughly where the house or the section is. Jamie will come and have a look, talk it through with you, and provide a quote - no obligation, anywhere from Pukerua Bay to Levin.
021 052 4447- Working the whole Kapiti Coast and north to Levin
- Licensed Building Practitioner (Carpentry)
- Building on the Kapiti Coast since 2003
- jcorrigan.builder@gmail.com
Plans help, and so do photos. If you have drawings, even a sketch, attach them to an email after you send this and Jamie can give you a much more useful first answer.